Segment 7: Duval County Line to Kindlewood Drive

Overview

Design: 90% Complete and holding
Right-of-way: Complete
Construction: Design- build, no schedule at this time
Project No: 208225-5

Project Info

Construction of this segment is not yet funded, but is being designed to:

  • expand the existing 2-lane rural roadway to a 4-lane divided limited-access highway

  • convert the existing two lanes to southbound travel lanes

  • add two new northbound lanes east of the existing roadway

  • construct a new parallel (northbound) bridge over Double Branch Slough at the south end of the project

  • add a new 2-lane overpass bridge on Plantation Oaks Blvd to carry Plantation Oaks Blvd traffic over the Branan Field-Chaffee Expressway. No access to Branan Field-Chaffee Expressway will be provided. (This overpass is located within this segment, but will be split out into a separate construction project with a new project number.)

     

    Previous Segment | Next Segment


     

    Associated Photos

     

    Segments 6 & 7 existing project photos

     

     

     

    For More Information Contact:
    Kathy Thomas - 800-207-8236
    kathy.thomas@dot.state.fl.us



    Back to Projects